Initially, the Jai Hind metro station was planned being elevated. Even so, the AAI objected the elevated stretch up on the airport could possibly pose a danger to plane, Hence the route was even more reworked plus the station was shifted underground, one hundred fifty m with the Airport terminal making. https://connerhmnpn.aboutyoublog.com/36435562/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf